Cost overrun and procurement competence in Sweden; Giancarlo Spagnolo; 2020
Cost overrun and procurement competence in Sweden; Giancarlo Spagnolo; 2020

Cost overrun and procurement competence in Sweden Upplaga 1

av Giancarlo Spagnolo

  • Upplaga: 1a upplagan
  • Utgiven: 2020
  • ISBN: 9789188637369
  • Sidor: 101 st
  • Förlag: SNS Förlag
  • Format: Häftad
  • Språk: Engelska

Om boken

Public procurement is a complex activity that while respecting legal requirements can be performed poorly or well. Public buyers need to identify and explicitly formulate their needs, balance risks and incentives in the contract, as well as monitor the contractor and manage the contract during the execution phase, which is often long and paved with unforeseen events. If handled badly, public procurement can lead to substantial cost overrun, as well as deficits in the quality of the goods and services provided, some of which are crucial to long-term economic growth. This report aims at informing the policy debate on what economic research suggests are the most likely causes and most effective remedies for public procurement failures.  The author, Giancarlo Spagnolo, professor in economics at Stockholm Institute of Transition Economics (SITE), concludes by offering practical recommendations on how to improve and sustain the level of procurement competence in Sweden. Cost Overrun and Procurement Competence in Sweden is published as part of SNS research project Sustainable Urban and Rural Planning.

Åtkomstkoder och digitalt tilläggsmaterial garanteras inte med begagnade böcker

Mer om Cost overrun and procurement competence in Sweden (2020)

I juni 2020 släpptes boken Cost overrun and procurement competence in Sweden skriven av Giancarlo Spagnolo. Det är den 1a upplagan av kursboken. Den är skriven på engelska och består av 101 sidor djupgående information om ekonomi. Förlaget bakom boken är SNS Förlag som har sitt säte i Stockholm.

Köp boken Cost overrun and procurement competence in Sweden på Studentapan och spara pengar.

Referera till Cost overrun and procurement competence in Sweden (Upplaga 1)

Harvard

Spagnolo, G. (2020). Cost overrun and procurement competence in Sweden. 1:a uppl. SNS Förlag.

Oxford

Spagnolo, Giancarlo, Cost overrun and procurement competence in Sweden, 1 uppl. (SNS Förlag, 2020).

APA

Spagnolo, G. (2020). Cost overrun and procurement competence in Sweden (1:a uppl.). SNS Förlag.

Vancouver

Spagnolo G. Cost overrun and procurement competence in Sweden. 1:a uppl. SNS Förlag; 2020.

Köp boken

Begagnad

Tillfälligt slut

156 kr

Skickas inom 5-8 vardagar av Bokus.

Frakt tillkommer med 29 kr. Fri frakt på beställningar från 250 kr.

Sälj vidare och få tillbaka pengar när du är klar.

Få 5% studentrabatt

på din beställning hos Bokus

Köp hos Bokus